ABOVE:
Sidewall buck stays severely buckled after the explosion.
|
LEFT:
This picture highlights the severe distortion to the sidewall tubes following
the explosion. To the left of the picture, the tubes have been straightened by
us. Those to the right have yet to be straightened.
The repair technique
we adopted to undertake this task was said by the boiler manufacturer to be impossible.
|
|
What the manufacturer
said:
Our
proposed repair method was impossible.
It
would take them 5 months to manufacture new parts and get them to site.
The
contract would take 10 months to complete.
The
cost would be in excess of £1million.
What CH Thompson accomplished:
Achieved
what was said to be impossible.
On
site within 4 weeks, fully equipped.
Completed
contract within 5 months.
Total
cost of £1/4million.
BELOW: The
boiler, repaired and back in service
|
|